Western Recycled Water Project: Eastern Pipeline 2008 Oil & Gas

Client: AJ Lucas
Location: Brisbane, Australia

Scope:

Construction of 4 x HDD Pipe strings 2 x 750NB X65 API5L x 9.53mm WT x 800m 2 x 600NB X65 API5L x 9.53mm WT x 800m Including Site Layout, Handling, Welding, NDT, Internal Joint Coating, External Joint Coating, Hydrotesting and Installation Assistance.