Stratford Power Station Peaker Project 2010 Power Generation

Client: United Group Ltd
Location: Stratford, Taranaki

Scope:

Assembly and Installation of the Main Turbine Unit (165 Tonne), Main Generator (80 Tonne), Auxiliary Skid (22 Tonne), Intercooler Vessel (20 Tonne), Water Skid (12 Tonne), Air Filter Assembly, Exhaust/Silencer, Supercore and significant volumes of Inter-connecting Piping.

  • Taranaki Combined Cycle Power Station Shutdown 2011
    Contact Energy
    Contact Energy
    + VIEW PROJECT
  • CTEC Peaker Plant 2012
    CTEC
    CTEC
    + VIEW PROJECT
  • Taranaki Combined Cycle Power Station Shutdown 2008
    Contact Energy
    Contact Energy
    + VIEW PROJECT