Archer Mud Tanks 2012 Oil & Gas

Client: Technip
Location: Maui A Platform, Taranaki

Scope:

Each tank had a 28M3; capacity and weighed 9.5 Tonne. The design, fabrication and load testing were carried out to DNV specification 2.7-3 and NZ maritime rule 24E. The Instrument Air, Control Systems and Agitators were installed and commissioned by Energyworks prior to dispatch.